BUS DELIVERY SIGN-OFF

Complete the required delivery inspection form below to confirm delivery and submit documentation to NFI Parts.

Delivery Inspection Form

INSPECTION CRITERIA FOR AROW GLOBAL DRIVER’S PROTECTION SYSTEM – DPS

Please complete all required fields.

To be Completed by the INSTALLER(S)
MM slash DD slash YYYY
BUS TIME IN
:
BUS TIME COMPLETED
:
*Pre Install Inspection: Inspect metal components to verify they are free of defects such as scratches, and dents and validate all parts are in the kit before installation.
Signature (If the signature box does not appear please refresh the page)
Signature (If the signature box does not appear please refresh the page)
Installer Name(Required)
Installer Name

To be completed by the CUSTOMER:

1) - Visually inspect the hinge post to ensure it is plum.
Comments
2) - Inspect and test the latch mechanism for proper function (opening and closing).
Comments
3) - If sliding glass, inspect the sash operation (smooth movement and locking indexing).
Comments
4) - Ensure all the mounting bolts are installed and properly secured.
Comments
5) - Verify components do not interfere with the farebox operations (including vault door, service panels, etc.).
Comments
6) - Installation area is left clean of debris after completion of work.
Comments
BUS TIME INSPECTED
:
Signature (If the signature box does not appear please refresh the page)
Customer Name(Required)
Drop files here or
Max. file size: 100 MB, Max. files: 4.